Jan 21, 2011

day 5: framing walls

We got at least 3 inches of snow overnight, but the job must go on.

After checking in with the guys at the house i went to pick up a masonry saw and some donuts. i rushed back so i'd get there before their morning break. Also, they had some walls already framed and i wanted to see them get raised into place. but 3 walls were up when i got back. oh well. here are some pics.

Homer Lane

Homer Farm

framed walls

east elevation

north elevation

filling in the link with gravel

Fuzzy, the excavator

Link (entry) foundation

gravel in the crawl space


vapor barrier

foreman

framing continues

nice view

interior bearing wall

more bearing wall sections - hall to master bedroom

finishing bearing wall

hoisting beam over kitchen island

No comments:

Post a Comment