Nov 16, 2011

day 306: towel bars


two days of mopping in the family room downstairs.


towel bars master bath.


towel bar guest bath.

Oct 6, 2011

day 265: trim+


the rest of the beadboard in the foyer appears to be about complete


cousin steve continues trimming the windows. this double window looks east over the fields from the fireplace area in the dining room.


the south windows in the dining room


the basement slate floors are laid, grouted, and sealed. Sunday looks pleased. i think she's claiming it for herself.


mom painted the large bedroom downstairs a non-yellow color called antique white. i plan to sleep here when visiting in the future.


the plumbers have also started work. here one of the guys hooks up the new 80-gallon water heater.

Sep 12, 2011

day 241: misc


chicken coop is being recycled as fill on the north side of the house


uncle steve brought in help. cousin steve will get all the trim going.


stevie threw in some beadboard for the powder room


the missing window sills arrived. uncle steve is spraying them so stevie can start trimming the windows.


mom and dad and i quickly assembled two giant 39x14x94 cabinets for the master closets before i left for NYC.


basement slate floors are mostly installed. we can't decide on a grout color yet. something gray/brown/green maybe.


subway tile in the guest bathroom


subway tile


the wood floors got their thrid coat of poly yesterday, so dad covered them in paper for protection.


and i installed the base cabinets along the back wall of the kitchen and put in all the drawers. next up is the island!

Jul 22, 2011

day 189: slate


slate tile down the hall to the laundry room and master bedroom

Jul 19, 2011

day 186: slate


brian tiled most of the kitchen floor yesterday.



mom's handiwork on the screen porch ceiling. painting in all the grooves of the barn siding ceiling was a bear.

Jul 18, 2011

day 185: slate

the first tile was laid today. mom shared a picture from this afternoon.

Jul 12, 2011

day 179: tile layout

i asked dad + mom to layout out some slate tile so we could choose a final pattern.

16"x16" slate, running bond: foyer, hall, powder room, laundry, kitchen, pantry, basement, etc.


12"x24" porcelain tile, running bond: master bathroom walls + floor


tiler hauler noted, "My shirt matches the wall paint!!! :-)"

Jul 8, 2011

day 175: tile pickup

dad borrowed uncle paul's giant pickup truck and drove down to get the tile. it's close to an hour drive each way, and he had to make a second trip since our order was so large. he picked up 16x16 slate tile for the basement family room/kitchenette/hall/bathroom, a different 16x16 slate tile for the upstairs foyer/powder room/hall/laundry/kitchen/pantry, and a 12x24 porcelain tile for the master bathroom floor and walls. He may have also picked up white 3x6 subway tile for the 2nd bathroom.


tile came from Pro Source in Cranberry Twp


16x16 slate tile


uncle paul used the tractor and a chain instead of unloading the tile one box at a time. notice the back tire lifting off the ground from the weight of the slate.


garage staging area. the rest was driven straight to the basement and slid inside using wood 2x4's.