Showing posts with label flooring. Show all posts
Showing posts with label flooring. Show all posts

Oct 18, 2011

day 277: lights & laminates


laminate flooring being installed in bedroom 3


flooring complete in bedroom 3


bedroom 2 flooring and wood trim is also installed


closet doors came primed, but they still need to be painted


the HVAC guys have been working all week installing the furnace and this heat pump/air conditioner.


electrician has been steadily progressing through the house.


the ceiling fan in the living room is one of seven fans in the house.


the light shelf in the master bedroom. the hole in the wall will get a return air grill covering it.

Jul 19, 2011

day 186: slate


brian tiled most of the kitchen floor yesterday.



mom's handiwork on the screen porch ceiling. painting in all the grooves of the barn siding ceiling was a bear.

Jul 18, 2011

day 185: slate

the first tile was laid today. mom shared a picture from this afternoon.