Aug 16, 2011
day 214: backfill
back-filling near the front door.
no more 10 foot drop from the front door!
dad and i assemble the kitchen island cabinets
tile begins at the master bath double sink area
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment