Nov 9, 2011

day 299: lots of progress


the pocket door to the pantry is finished now that it has a door pull, and the Steves trimmed out the kitchen window, which might have been the last window. The countertops on order won't be installed for quite a while, so they opted to put in some OSB temporary counters and get the sink hooked up.


Overall kitchen view with temporary plywood counters and completed toekicks and cabinets. Looks like it just needs a few pulls installed.


Most of the trim work is complete, so the Steves started outfitting the closets. (Left) the linen closet in the 2nd bathroom, and (Right) a coat closet in the entry foyer.


Progress continues on the fireplace stone and mantel.


the excavator laid out a parking lot and brought in some ground-up blacktop to give everything a solid base.


dad painting the rooflet and the built-up driveway


smoothed out lower yard


the door at the back of the garage now has a stoop. this is one of the unearthed concrete slabs.

Nov 1, 2011

day 291: mantle


Eric, our stone guy, installed the solid cherry mantle beam. the chunks of cherry wood sitting there on top will be mounted under the beam as corbels, even though they apparently won't actually be doing any work holding up the mantle. but that is the idea. Eric also installed the stone arch.

Oct 24, 2011

day 283: fireplace stone


Dad got the guys down the street to cut the mantle and corbels for us, and there has been some progress on the fireplace stone. see Dog?


Dog wants to move in, or at least a ride home.