day 299: lots of progress
the pocket door to the pantry is finished now that it has a door pull, and the Steves trimmed out the kitchen window, which might have been the last window. The countertops on order won't be installed for quite a while, so they opted to put in some OSB temporary counters and get the sink hooked up.
Overall kitchen view with temporary plywood counters and completed toekicks and cabinets. Looks like it just needs a few pulls installed.
Most of the trim work is complete, so the Steves started outfitting the closets. (Left) the linen closet in the 2nd bathroom, and (Right) a coat closet in the entry foyer.
Progress continues on the fireplace stone and mantel.
the excavator laid out a parking lot and brought in some ground-up blacktop to give everything a solid base.
dad painting the rooflet and the built-up driveway
smoothed out lower yard
the door at the back of the garage now has a stoop. this is one of the unearthed concrete slabs.