Jan 18, 2011

day 2: garage foundation

Dad took these pictures of the first day the construction crew is on site. the materials arrived on 2 semi trucks. the Amish crew installed the sill plates on the basement walls of the house and staked out the link and garage foundations. The excavator came and dug out the footings. Then the crew went right to putting in the rebar and mixing and pouring concrete for the footing. Dad took some digital pictures for the inspector.

Superior Walls sign, no Homer Lane sign - stolen again!
lunch buckets

2 semi trucks full of materials

lumber but no beams

prep on the walls - shoveling

staking the link + garage

digging footers + bolting on sill plates

garage footer

built in ledges for Link foundation