Jan 14, 2011

day 1: basement walls

The basement walls were installed on Friday. Uncle Paul took some pictures for us of the walls being placed by Superior Walls. While it looks like the entire basement is above ground, the back side will be back-filled and only the window side will remain completely visible. So that side has a gravel footing down to the frost line.







No comments:

Post a Comment